检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张海涛 Zhang Haitao(Shuiyu Coal Industry of Shanxi Fenxi Mining Group,Xiaoyi Shanxi 032302)
机构地区:[1]山西汾西矿业集团水峪煤业,山西孝义032302
出 处:《晋控科学技术》2025年第2期14-16,22,共4页Jinneng Holding Science and Technology
摘 要:矿井采掘平衡是保证生产效率的重要因素。以山西汾西矿业集团水峪煤业为背景,详细分析了地质条件、掘进工艺与巷道变形特征,协调了掘进工艺,以架棚方式临时支护配合锚杆锚索联合支护方案,实现了平行作业,采掘平衡。掘进巷道掘进效率显著提高,巷道围岩变形量较小,为工作面的顺利开采及接替提供了保障。The balance of mining and excavation is an important factor to ensure the production efficiency.Taking Shuiyu Coal Industry of Shanxi Fenxi Mining Group as the background,the geological conditions,excavation technology and roadway deformation characteristics were analyzed in detail.The excavation technology was coordinated,and the parallel operation and mining balance were realized by means of temporary support and combined support with anchor rods and cables.The excavation efficiency of the roadway was significantly improved,and the deformation of the surrounding rock of the roadway is relatively small,which provides a guarantee for the smooth mining and replacement of the working face.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13