市政综合管廊工程施工风险控制措施  

Construction Risk Control Measures of Municipal Administration Integrated Pipe Corridor Project

在线阅读下载全文

作  者:王茗 WANG Ming(China Railway 16th Bureau Group Subway Engineering Co.,Ltd.,Beijing 100024,China)

机构地区:[1]中铁十六局集团地铁工程有限公司,北京100024

出  处:《北方建筑》2025年第2期17-20,共4页Northern Architecture

摘  要:为有效提高市政综合管廊工程的安全性,本文依托B社区市政主次干路及综合管廊工程施工四标段工程。通过分析该项目具体的施工风险,针对地下环境、地下设施、起重吊装和起重机械安装、模板工程及支撑体系中的风险提出管理控制措施。从基坑土石方工程施工、基坑放坡支护施工、土方回填施工三方面总结出技术控制措施,以保证该工程施工安全与整体质量。相关措施适用于同类工程,为加强市政综合管廊工程施工风险控制提供了实践参考。In order to effectively enhance the safety of municipal integrated utility tunnel projects,this paper relies on the construction of the fourth contract section of the main and secondary roads and integrated utility tunnels in the B community.By analyzing the specific construction risks of this project,management and control measures are proposed for risks in the underground environment,underground facilities,lifting and hoisting as well as the installation of lifting machinery,formwork engineering and support systems.Technical control measures are summarized from three aspects:earthwork construction of foundation pits,slope support construction of foundation pits,and backfilling construction of soil,to ensure the construction safety and overall quality of the project.These measures are applicable to similar projects and provide practical references for strengthening the construction risk control of municipal integrated utility tunnel projects.

关 键 词:市政工程 综合管廊 基坑施工技术 风险控制 

分 类 号:TU990.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象