检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张丕富 杨安云 ZHANG Pifu;YANG Anyun(Chengdu Power Supply Section,China Railway Chengdu Group Co.,Ltd.,Chengdu 610051 Sichuan,China)
机构地区:[1]中国铁路成都局集团有限公司成都供电段,成都610051
出 处:《铁道机车车辆》2025年第S1期116-120,共5页Railway Locomotive & Car
摘 要:新建铁路验收阶段,接触网燃弧是动态验收中的常见问题。接触网燃弧现象对接触网的性能影响较大,并影响线路最终CDI得分评价。通过结合2023年开通的川青铁路三星堆至镇江关段、2024年开通的川青铁路镇江关至黄胜关段接触网燃弧整治,深入分析燃弧产生的原因,制定相应的预防、处置措施,确保接触网系统、弓网系统运行正常。During the acceptance stage of a new railway,arcing of the overhead contact system is a common problem in dynamic acceptance.The phenomenon of arcing in the overhead contact system has a significant impact on its performance and affects the final CDI score evaluation of the line.This article analyzes the causes of arcing in the overhead contact system of the Sanxingdui to Zhenjiangguan section of the Sichuan Qinghai Railway,which will be opened in 2023,and the Zhenjiangguan to Huangshengguan section of the Sichuan Qinghai Railway,which will be opened in 2024.Corresponding prevention and disposal measures are formulated to ensure the normal operation of the overhead contact system and catenary system.
分 类 号:U225[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.26