下承式提篮吊杆拱桥施工控制关键技术研究  

Research on Key Technologies for Construction Control of Down-Supported Basket-Hanging Rod Arch Bridges

在线阅读下载全文

作  者:郑志东 ZHENG Zhidong

机构地区:[1]福州左海控股集团有限公司,福建福州350028

出  处:《福建建设科技》2025年第2期77-80,共4页Fujian Construction Science & Technology

摘  要:以某跨径为40m+103m+120m+47m=310m下承式提篮吊杆拱桥为工程背景,基于有限元软件Midas Civil进行施工过程分析,并根据现场测试数据修正吊杆的无应力长度。在现场实测和有限元分析的有效结合下,明确了下承式拱桥体系转换过程的关键施工控制参数,提出的考虑施工安全、经济性的体系转换方案能够有效实现从临时支架承担受力转向拱肋受力的过程,可以为类似工程提供借鉴。Based on the engineering background of a through type basket suspended arch bridge with a span of 40m+103m+120m+47m=310m,the construction process was analyzed using the finite element software Midas Civil,and the stress free length of the suspension rod was corrected based on on-site test data.Through the effective combination of on-site measurement and finite element analysis,the key construction control parameters for the transformation process of the through arch bridge system have been clarified.The proposed system transformation plan considering construction safety and economy can effectively achieve the process of shifting from temporary support to arch rib stress,which can provide reference for similar projects.

关 键 词:下承式拱桥 施工控制 无应力长度 体系转换 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象