作 者:董晨阳 DONG Chenyang
机构地区:[1]中国铁路设计集团有限公司
出 处:《电气化铁道》2025年第2期31-35,共5页Electric Railway
摘 要:随着电气化铁路运营里程的不断增加,铁路牵引供电网络越发复杂。精准的牵引供电系统故障定位,是及时发现并排除故障的前提保障。电气化铁路牵引供电的分相设置于大型车站附近时,如无法在牵引变电所附近一侧设置分相,则较难进行牵引变电所的故障方向辨别以及故障测距。本文结合工程经验,深入分析车站分相异侧设置时几种常见故障的判别及定位方法原理,总结方案的适用范围以及优势与不足,为今后此类问题的故障定位方案提供思路。Along with the continuous increase of electrified railway operation mileage,the railway traction power supply network is becoming increasingly complex.Accurate fault location of the traction power supply system is a prerequisite for timely inspection and troubleshooting.When the phase separations of traction power supply for electrified railways are set near a large scale station,if it is not possible to set the phase separations on one side near the traction substation,it is difficult to identify the fault direction and distance measurement of the traction substation.The paper,with reference of the engineering experience,analyzes profoundly the principles of several common fault identification and fault location methods when setting of phase separation at different sides of a station,summarizes the scope of application,advantages,and disadvantages of the solutions,and provides ideas for future fault location solutions for such problems.
关 键 词:牵引供电系统 车站分相异侧设置 故障方向判别 定位方案
分 类 号:U226.8[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198