检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:秦国金 史建明 QIN Guojin;SHI Jianming
机构地区:[1]中铁五局电务工程有限责任公司
出 处:《电气化铁道》2025年第2期59-61,共3页Electric Railway
摘 要:传统供电线路钢柱及基础设计多参考软横跨支柱及基础通用图,很少对供电线路钢柱及基础进行专项深化设计,造成钢柱容量和基础选型差异极大。本文对传统设计方案存在问题进行深入分析,从钢柱容量和基础设计以及方向布置方面提出相应解决措施,对后续供电线专项深化设计提供一定参考。The traditional design of steel masts and foundations for power supply feeders often refers to the general drawings of masts and foundations of head-span,and detailed design of steel masts and foundations is rarely conducted for power supply feeders,resulting in significant differences in steel mast capacity and foundation selection.The paper analyzes profoundly the problems existing in traditional design schemes,and proposes corresponding solutions from the aspects of steel mast capacity,foundation design,and directional layout,providing a certain reference for the subsequent specialized deepening design of power supply feeders.
分 类 号:U227.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7