10kV配网工程建设前期精益化管理  

Lean Management in the Pre-Construction Phase of 10kV Distribution Network Projects

在线阅读下载全文

作  者:施林涵 Shi Linhan(State Grid Fuzhou Power Supply Company,Fuzhou 350009,Fujian)

机构地区:[1]国网福建省电力有限公司福州供电公司,福建福州350009

出  处:《福建冶金》2025年第3期68-70,共3页Fujian Metallurgy

摘  要:目前,配网工程全过程管理存在现场施工受阻多发、过程设计变更频繁、配网管理信息化水平不高的问题。本文从10kV配网工程建设前期管理入手,通过精益初设深度、前置复勘流程、强化政企协同、提升数字化水平、强化开复工管理等五个方面开展工程建设前期精益化管理,从项目建设源头提升配网工程全过程管理水平。Currently,the whole-process management of distribution network projects faces challenges such as frequent on-site construction obstructions,excessive design changes during the process,and insufficient digitalization in management.This paper focuses on the preliminary management of 10kV distribution network projects and proposes a lean management framework across five dimensions:refining initial design depth,implementing pre-construction re-inspection processes,strengthening government-enterprise collaboration,enhancing digitalization capabilities,and improving construction commencement and resumption management.These measures aim to optimize the management level from the project initiation phase,thereby elevating the overall efficiency of distribution network project management.

关 键 词:配网工程 前期管理 项目复勘 数字化 

分 类 号:TM72[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象