某多金属矿山整合升级技术方案设计与技术经济分析  

Technical Scheme Design and Technological and Economic Analysis of a Polymetallic Mine Integration and Upgrade

在线阅读下载全文

作  者:肖利民 刘泽洲 董翔 彭斌 XIAO Limin;LIU Zezhou;DONG Xiang;PENG Bin(Changsha Institute of Mining and Research Co.,Ltd.,Changsha,Hunan 410012,China;State Key Laboratory of Safety Technology for Metal Mines,Changsha,Hunan 410012,China)

机构地区:[1]长沙矿山研究院有限责任公司,湖南长沙410012 [2]金属矿山安全技术国家重点实验室,湖南长沙410012

出  处:《中国锰业》2025年第1期80-82,91,共4页China Manganese Industry

摘  要:在搜集和分析了某多金属矿山保有资源量、矿体赋存状况、开采现状的基础上,对该矿区范围的3个矿段进行了统筹整合设计。经研究分析,推荐整合后矿山总的采矿生产能力为60×10^(4)t/a,沿用地下开采方式,选用平底结构浅孔留矿采矿法;推荐采用混合主井-罐笼副井-东盲斜井联合开拓运输方案(矿石集中有轨运输)。矿山分两期建设,一期先开采Ⅰ号矿段和Ⅱ号矿段,二期开采Ⅰ号矿段、Ⅱ号矿段和Ⅲ号矿段;井下采用分区通风和分区排水方式。技术经济分析结果显示,项目按推荐的设计方案建成投产后,具有较强的财务生存能力、偿债能力、抗风险能力,该方案在经济上是可行。After collecting and analyzing data on the reserves,orebody occurrence,and current mining status of a polymetallic mine,a comprehensive integration and design of the three mining sections within the mine area were conducted.It is recommended that the integrated mine have a total mining production capacity of 60×10^(4)t/a,continuing with underground mining and adopting the flat-bottomed shallow hole open stoping method.A combined development and transportation scheme is proposed,involving a main shaft,cage auxiliary shaft,and east blind adit(with centralized rail transportation of ore).The mine will be built in two phases:PhaseⅠwill mine sectionsⅠandⅡ,and PhaseⅡwill mine sectionsⅠ,Ⅱ,andⅢ.Underground zoning ventilation and drainage will be implemented.Results of the technological and economic analysis show that,upon completion and operation following the recommended design,the project will have strong financial viability,debt repayment ability,and risk resistance,indicating its economic feasibility.

关 键 词:多金属矿山 资源整合 地下开采 联合开拓系统 分区通风 

分 类 号:TD212[矿业工程—矿井建设]

 