检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄裕健 万利台 HUANG Yu-jian;WAN Li-tai(Guangdong Water Conservancy and Electric Power Survey&Design Research Institute Co.,Ltd.,Guangzhou 510635,China)
机构地区:[1]广东省水利电力勘测设计研究院有限公司,广州510635
出 处:《广东水利电力职业技术学院学报》2025年第2期34-38,共5页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering
摘 要:输水系统是抽水蓄能电站的主要建筑物之一,通过结合施工方法、施工设备、施工工艺对输水系统纵剖面二级竖井方案优化为一级竖井方案,可以进一步缩短工期、降低工程投资、减少超危大风险作业面。The water conveyance system is one of the main structures of a pumped storage power station.By optimizing the longitudinal profile scheme from a two-stage vertical shaft to a single-stage vertical shaft through a comprehensive analysis of construction methods,equipment,and processes,the project can further shorten the construction period,reduce investment costs,and minimize the scope of extremely hazardous operations.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49