安徽桐城抽水蓄能电站引水纵剖面方案优化设计  

Optimization Design of the Longitudinal Profile Scheme for the Water Conveyance System of Tongcheng Pumped Storage Power Station in Anhui

在线阅读下载全文

作  者:黄裕健 万利台 HUANG Yu-jian;WAN Li-tai(Guangdong Water Conservancy and Electric Power Survey&Design Research Institute Co.,Ltd.,Guangzhou 510635,China)

机构地区:[1]广东省水利电力勘测设计研究院有限公司,广州510635

出  处:《广东水利电力职业技术学院学报》2025年第2期34-38,共5页Journal of Guangdong Polytechnic of Water Resources and Electric Engineering

摘  要:输水系统是抽水蓄能电站的主要建筑物之一,通过结合施工方法、施工设备、施工工艺对输水系统纵剖面二级竖井方案优化为一级竖井方案,可以进一步缩短工期、降低工程投资、减少超危大风险作业面。The water conveyance system is one of the main structures of a pumped storage power station.By optimizing the longitudinal profile scheme from a two-stage vertical shaft to a single-stage vertical shaft through a comprehensive analysis of construction methods,equipment,and processes,the project can further shorten the construction period,reduce investment costs,and minimize the scope of extremely hazardous operations.

关 键 词:输水系统 纵剖面 一级竖井 二级竖井 

分 类 号:TV743[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象