检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Tien-Wen Sung Wei Li Chao-Yang Lee Yuzhen Chen Qingjun Fang
机构地区:[1]Fujian Provincial Key Laboratory of Big Data Mining and Applications,College of Computer Science and Mathematics,Fujian University of Technology,Fuzhou,350118,China [2]Department of Computer Science and Information Engineering,National Yunlin University of Science and Technology,Yunlin,640301,Taiwan,China
出 处:《Computers, Materials & Continua》2025年第4期407-434,共28页计算机、材料和连续体(英文)
基 金:supported by the Fujian University of Technology under Grant GYZ20016,GY-Z18183,and GY-Z19005;partially supported by the National Science and Technology Council under Grant NSTC 113-2221-E-224-056-.
摘 要:To transmit customer power data collected by smart meters(SMs)to utility companies,data must first be transmitted to the corresponding data aggregation point(DAP)of the SM.The number of DAPs installed and the installation location greatly impact the whole network.For the traditional DAP placement algorithm,the number of DAPs must be set in advance,but determining the best number of DAPs is difficult,which undoubtedly reduces the overall performance of the network.Moreover,the excessive gap between the loads of different DAPs is also an important factor affecting the quality of the network.To address the above problems,this paper proposes a DAP placement algorithm,APSSA,based on the improved affinity propagation(AP)algorithm and sparrow search(SSA)algorithm,which can select the appropriate number of DAPs to be installed and the corresponding installation locations according to the number of SMs and their distribution locations in different environments.The algorithm adds an allocation mechanism to optimize the subnetwork in the SSA.APSSA is evaluated under three different areas and compared with other DAP placement algorithms.The experimental results validated that the method in this paper can reduce the network cost,shorten the average transmission distance,and reduce the load gap.
关 键 词:Smart grid data aggregation point placement network cost average transmission distance load gap
分 类 号:TM76[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7