采用改进黑洞算法优化车辆速度控制仿真研究  

Simulation Research on Optimizing Vehicle Speed Control Using Improved Black Hole Algorithm

在线阅读下载全文

作  者:李晓英[1] 王小洁[2] 黄淳 刘书丹[4] LI Xiaoying;WANG Xiaojie;HUANG Chun;LIU Shudan(Department of Computer Applications Guilin University of Technology,Guangxi Guilin 541004,China;Department of Computer Engineering Shanxi Polytechnic College,Shanxi Taiyuan 030006,China;College of Artificial Intelligence Chongqing Creation Vocational College,Chongqing 402160,China;School Work Department Chongqing Creation Voca-tional College,Chongqing 402160,China)

机构地区:[1]桂林理工大学计算机应用系,广西桂林541004 [2]山西职业技术学院计算机工程系,山西太原030006 [3]重庆科创职业学院人工智能学院,重庆402160 [4]重庆科创职业学院学工部,重庆402160

出  处:《机械设计与制造》2025年第4期305-308,313,共5页Machinery Design & Manufacture

基  金:2019年度广西高校中青年教师基础能力提升项目—基于高校大数据的学生画像系统研究(2019KY0270)。

摘  要:为了缩短混合动力汽车起步时间,设计了汽车电机分数阶模糊PD+I控制器,并对电机转速启动效果进行仿真验证。给出了非线性车辆动力学模型,根据牛顿第二定律,推导出非线性混合动力汽车动力学方程式。针对模糊PID控制系统进行改进,设计了汽车电机分数阶模糊PD+I控制器。为了提高控制系数自适应响应速度,采用改进黑洞算法对其进行优化,给出了电机控制系统的优化流程。为了检验优化后的控制系统输出效果,采用MATLAB软件对混合动力汽车电机响应速度进行仿真,并且与优化前输出结果进行对比。结果显示:优化前,混合动力汽车电机自适应调节时间较长,受到外界干扰时,电机转速变化幅度较大;优化后,混合动力汽车电机自适应调节时间较短,受到外界干扰时,电机转速变化幅度较小。采用改进黑洞算法优化分数阶模糊PD+I控制器,可以提高电机响应速度,缩短混合动力汽车起步时间。In order to shorten the starting time of hybrid electric vehicle,a fractional order fuzzy PD+I controller is designed,and the starting effect of motor speed is verified by simulation.According to Newton's second law,the nonlinear vehicle dynamics equation is derived.In view of the improvement of fuzzy PID control system,a fractional order fuzzy PD+I controller is designed.In order to improve the adaptive response speed of the control coefficient,the improved black hole algorithm is used to optimize it,and the optimization process of the motor control system is given.In order to test the output effect of the optimized control system,the response speed of the hybrid electric vehicle motor is simulated by MATLAB software,and the results are compared with those before the optimization.The results show that:before the optimization,the adaptive adjustment time of the hybrid electric vehicle motor is longer,when it is disturbed by the outside world,the change range of the motor speed is larger;after the optimization,the adaptive adjustment time of the hybrid electric vehicle motor is shorter,when it is disturbed by the outside world,the change range of the motor speed is smaller.Using the improved black hole algorithm to optimize the fractional order fuzzy PD+I controller can improve the response speed of the motor and shorten the starting time of the hybrid vehicle.

关 键 词:改进黑洞算法 分数阶模糊PD+I控制器 电机 优化 仿真 

分 类 号:TH16[机械工程—机械制造及自动化] TH137

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象