检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Weixiang FENG Yijun LONG Xiaoqing PAN Ruiliang CHEN Chunliang ZHANG Hui YANG
机构地区:[1]Maoming Meteorological Bureau,Maoming 525000,China [2]China Power Construction Hengdong Wind Power Co.,Ltd.,Hengyang 421400,China [3]Guangdong Yuedian Yangjiang Offshore Wind Power Co.,Ltd.,Yangjiang 529500,China [4]Guangdong Foshan Shunde Lunjiao Jindun Lightning Protection Technology Development Co.,Ltd.,Foshan 528308,China [5]Guangzhou Meteorological Bureau,Guangzhou 510530,China
出 处:《Meteorological and Environmental Research》2025年第1期44-48,共5页气象与环境研究(英文版)
基 金:Supported by Research on Key Technologies of Lightning Intelligent Protection System for Guangdong Energy Hehe Sea Wind Farm(SFC/QZW-ZX-XF-24-020).
摘 要:In the past,the lightning strike risk assessment of wind farms mainly referred to the Lightning Protection Part 2:Risk Management(IEC 62305-2-2010)and the Lightning Protection of Wind Energy System(IEC 61400-24-2019)based on protection angle method.In fact,the basic idea of the two is the same,that is,the source of the lightning fan is replaced by S1-S4 of the former lightning building with the latter ND-NDJ.According to the above method of wind farm evaluation,it has been proved that the practice can not achieve good results.Taking offshore wind farm as an example,this paper introduces a new method of establishing six evaluation indicators to determine the risk level according to the new technology and compliance principle of regional lightning protection(semi-circular method),which can be used for reference by wind farm technicians.
关 键 词:Sea and land wind electric field Lightning strike risk assessment Compliance principle New evaluation method
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7