检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史红军 SHI Hongjun(Gansu Gonghang Travel Mawu Xizhai Expressway Management Co.,Ltd.,Dingxi 748400,China)
机构地区:[1]甘肃公航旅马坞西寨高速公路管理有限公司,甘肃定西748400
出 处:《技术与市场》2025年第4期83-86,共4页Technology and Market
摘 要:目前有多种传统的软土路基处理方法,但每一种处理方法都有明显的缺陷。为克服传统软土路基处理方法的缺点,在G341二十里沟口至车路崾岘一级公路软土路基处理中,采用了就地固化技术,提出了一种在软土中掺加“20%水泥+12.7%固化剂A”的方法,采用该固化剂进行就地固化处理后,该项目软土路基的承载力得到大幅提升。路基施工完成后,软土路基平均沉降值为19.7 cm,和天然地基段路基沉降值无明显差异。该施工方法与传统的换填法相比,可节省约34.8%的施工成本。There are many traditional methods for treating soft soil roadbeds,but each method has obvious defects.In order to overcome the shortcomings of traditional soft soil roadbeds treatment methods,the in-situ solidification technology was adopted in the treatment of soft soil roadbeds of G341 Ershiligoukou to Cheluyaoxian first-class highway with an agent of 20%cement and 12.7%curing agent A was proposed.After the in-situ solidification treatment with this curing agent,the bearing capacity of the soft soil roadbeds of the project was greatly improved.After the completion of the roadbed construction,the average settlement value of the soft soil roadbed is 19.7cm,which is not significantly different from the settlement value of the natural foundation section roadbed;Compared with traditional replacement methods,it can save about 34.8%of construction costs.
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200