检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘传吉 陈琳 LIU Chuanji;CHEN Lin(Linqing First Construction Engineering Co.,Ltd.,Linqing 252600,China)
机构地区:[1]临清市第一建筑工程有限责任公司,山东临清252600
出 处:《中国厨卫》2025年第4期96-98,101,共4页Chinese Kitchen & Bathroom
摘 要:文章从装配式建筑机电工程的关键施工技术要点出发,分析了管道预制安装、叠合板电气预埋盒安装、套管预留、可调式线盒安装、电缆支吊架预制安装、机电设备安装、超大件运输吊装等技术环节。针对高层建筑电气预埋模块化施工过程中常见的问题,提出了优化设备基础安装、完善电气管路预埋作业和加强施工管理等对策,有效提升了施工质量与效率,保障了工程的顺利进行。Starting from the key construction technology points of prefabricated building electromechanical engineering,this article analyzes the technical links such as pipeline prefabrication and installation,installation of composite panel electrical embedded boxes,casing reservation,installation of adjustable wire boxes,prefabrication and installation of cable supports and hangers,installation of electromechanical equipment,and transportation and hoisting of oversized items.In response to common problems in the modular construction process of electrical pre embedding in high-rise buildings,measures are proposed to optimize equipment foundation installation,improve electrical pipeline pre embedding operations,and strengthen construction management,effectively improving construction quality and efficiency and ensuring the smooth progress of the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49