建筑机电安装中管线综合布置的优化方法与实践  

Optimization Methods and Practices for Integrated Pipeline Layout in Building MEP Installation

在线阅读下载全文

作  者:董国庆 朱磊 DONG Guoqing;ZHU Lei(Beijing Construction Engineering Group Co.,Ltd.,Beijing 100055,China)

机构地区:[1]北京建工集团有限责任公司,北京100055

出  处:《中国厨卫》2025年第4期151-153,共3页Chinese Kitchen & Bathroom

摘  要:文章围绕管线布置的基本原理与方法,分析了空间利用不充分、施工与维护难度大、管线冲突以及功能需求不匹配等问题。结合优化算法和BIM技术,文章提出了多目标优化、模块化布置等解决方案,提高了管线布置的科学性和合理性,降低了成本,为建筑机电工程提供了优化路径与实践指导。This article focuses on the basic principles and methods of pipeline layout,analyzing issues such as insufficient space utilization,difficulty in construction and maintenance,pipeline conflicts,and mismatched functional requirements.Combining optimization algorithms and BIM technology,the article proposes solutions such as multi-objective optimization and modular layout to improve the scientific and rational layout of pipelines,reduce costs,and provide optimization paths and practical guidance for building electromechanical engineering.

关 键 词:建筑机电安装 管线综合布置 优化算法 

分 类 号:TU990.3[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象