作 者:任晓鹏 Ren Xiaopeng(Shanxi New Carbon Superhard Material Technology Co.,Ltd.,Yangquan 045000,China)
机构地区:[1]山西新碳超硬材料科技有限公司,山西阳泉045000
出 处:《煤炭与化工》2025年第4期104-107,共4页Coal and Chemical Industry
摘 要:本文针对山西平舒煤业有限公司温家庄矿井15号煤层四盘区供电系统进行了选型设计。设计采用双回路供电方式,由地面110/10 kV变电站向井下中央变电所供电,经高压电缆送至四盘区配电室,再向采掘工作面供电。通过对动力回路和专供回路电缆的选型计算,以及高压开关的选择与校验,确保了供电系统的稳定性和可靠性。本文详细阐述了设计过程和选型依据,为平舒煤业四盘区供电系统的稳定运行提供了技术支持。In this paper,the selection and design of the power supply system of the fourth panel of No.15 coal seam in Wenjiazhuang Mine of Shanxi Pingshu Coal Industry Co.,Ltd.is carried out.The design adopts double-circuit power supply mode,which is powered by the ground 110/10 kV substation to the underground central substation,sent to the distribution room of the fourth panel through high-voltage cable,and then powered to the mining face.Through the selection and calculation of the power circuit and the dedicated circuit cable,as well as the selection and verification of the high-voltage switch,the stability and reliability of the power supply system are ensured.This paper elaborates the design process and selection basis,and provides technical support for the stable operation of the power supply system in the fourth panel of Pingshu Coal Industry.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33