谈上海嘉定某新建厂房桩基静载检测的技术要点  

Discussion of Technical Points for Static Load Testing of Pile Foundation in a Newly Built Factory Building in Jiading,Shanghai

在线阅读下载全文

作  者:乐平欢 LE Ping-huan(Shanghai Hom Construction Engineering Technology Services Co.,Ltd.,Shanghai 200000,China)

机构地区:[1]上海豪米建设工程技术服务有限公司,上海200000

出  处:《价值工程》2025年第13期22-28,共7页Value Engineering

摘  要:总结上海嘉定某新建厂房桩基静载检测,探讨了静载检测中停止加载的时机对于判断检测结果的重要性、勘察数据从理论上帮助分析静载检测结果的有效性、本项目地区土层时间效应对桩基承载力的影响这几个技术要点并以实例证明。Summarizing the static load testing of pile foundation in a newly built factory building in Jiading,Shanghai,this paper explores the importance of the timing of stopping loading in determining the testing results,the theoretical assistance of survey data in analyzing the effectiveness of static load testing results,and the impact of soil layer time effect on the bearing capacity of pile foundation in this project area,and proves the technical points with examples.

关 键 词:静载 技术要点 时间效应 

分 类 号:TU473.16[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象