检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王文文 WANG Wen-wen(Jiaxiang County Huinong Construction Co.,Ltd.,Jining 272400,China)
出 处:《价值工程》2025年第13期141-144,共4页Value Engineering
摘 要:曲线顶管技术是水利工程中的常用技术,该技术在施工中有着较高的控制要求,需要注意技术方面的控制,满足工程建设质量控制的相关要求。本文结合某项工程对曲线顶管施工技术进行探讨,总结曲线顶管施工的过程,分析工程施工过程中的关键点,并对施工中的质量问题和处理方法进行重点讨论,帮助施工人员优化施工技术,保证曲线顶管施工的整体质量。Curved pipe jacking technology is a commonly used technique in hydraulic engineering,which has high control requirements in construction and requires attention to technical control to meet the relevant requirements of engineering construction quality control.This article discusses the construction technology of curved pipe jacking based on a certain project,summarizes the process of curved pipe jacking construction,analyzes the key points in the construction process,and focuses on discussing the quality problems and treatment methods during construction,helping construction personnel optimize construction technology and ensure the overall quality of curved pipe jacking construction.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200