检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李冲 王科学 高裔飞 郑斌 周喻[3] LI Chong;WANG Kexue;GAO Yufei;ZHENG Bin;ZHOU Yu(China Nonferrous Metal Mining(Group)Co.,Ltd.,Beijing 100029,China;Kambove Mining SAS,Lubumbashi 999059,Democratic Republic of Congo(DRC);Key Laboratory of Ministry of Education for Efficient Mining and Safety of Metal Mines,University of Science and Technology Beijing,Beijing 100083,China;China Nonferrous Metals(Guilin)Geology and Mining Resources Co.,Ltd.,Guilin,Guangxi 541004,China)
机构地区:[1]中国有色矿业集团有限公司,北京100029 [2]刚波夫矿业股份有限公司,刚果民主共和国卢本巴希999059 [3]北京科技大学金属矿山高效开采与安全教育部重点实验室,北京100083 [4]中国有色桂林矿产地质研究院有限公司,广西桂林市541004
出 处:《矿业研究与开发》2025年第4期164-171,共8页Mining Research and Development
摘 要:为准确预测刚波夫主矿体露天矿揭露含水层后的矿坑涌水量,结合矿山已有水文地质资料开展矿山现场抽水试验,基于大井法中的承压转无压公式计算了矿山不同开采年份的矿坑涌水量。依据现场水文地质资料和抽水试验结果,将主矿体分为强富水区(Ⅰ)、中等富水区(Ⅱ)和隔水层(Ⅲ);矿坑在生产第3年推采至1 300 m水平时,地下涌水量最小;在生产第6年推采至1 270 m水平时,地下涌水量达到最大值;结合正常雨季和暴雨季降雨量,计算矿坑总涌水量分别可以达到23 152 m^(3)/d和46 552 m^(3)/d。研究结果可为该矿山后续的防排水方案制定提供重要的数据支撑。In order to accurately predict the mine water inflow after exposing the aquifer in the open-pit mine of the main ore body of Kambove mine,the mine field pumping test was carried out in combination with the existing hydrogeological data of the mine,and the mine pit water inflow in different mining years was calculated based on the pressure bearing transfer to no pressure formula in the large well method.Based on field hydrogeological data and pumping test results,the main ore body is divided into strong water-rich zone(I),medium water-rich zone(I)and an aquifer(II).When the mine is pushed to a level of 1300 m in the third year of production,the underground water inflow is the smallest.When the mining level reached 1270 m in the sixth year of production,the underground water inflow reached its maximum value.Combined with the rainfall in normal rainy season and rainstorm season,the total water inflow of the mine pit can reach 23152 m^(3)/d and 46552 m^(3)/d respectively.The research results can provide important data support for the development of subsequent waterproofing and drainage plans for the mine.
分 类 号:TD742.1[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70