新型厂房结构设计疑难问题分析  

Analysis of difficult problems in the structural design of new type of factory building

在线阅读下载全文

作  者:程钱旺[1] CHENG Qian-wang(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)

机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023

出  处:《广西水利水电》2025年第2期62-66,共5页Guangxi Water Resources & Hydropower Engineering

摘  要:新型厂房具有活荷载大、跨度大、层高高、层数多等特征。介绍了厂房结构方案比选、活荷载相关系数的取值、地震作用计算参数及活载的重力荷载代表值组合系数的取值。分析了产业园中“假厂房”的活荷载取值、底部楼层刚度偏小的对策、高大砌体填充墙的稳定性问题。提出了针对楼板易开裂部位的技术处理措施。New type of factory building has the characteristics of large live load,big span,high floor height and multi-ple floors.An introduction was made on the comparison of factory building structural schemes,the selection of live load correlation coefficient,seismic action calculation parameters and combination coefficient of gravity load repre-sentative value of live load.Analysis was made on the live load of"fake factory buildings"in industrial parks,the countermeasures for too low stiffness of the bottom floor,and on the stability problem of tall masonry infill walls.The author also put forward the technical treatment measures for the cracking prone areas of floor slabs.

关 键 词:结构体系 活荷载折减 活荷载分项系数 荷载组合系数 墙体稳定性 楼层刚度比 

分 类 号:TU375.4[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象