大藤峡水利枢纽工程一期下闸蓄水移民安置度汛方案  

Flood period plan of resettlement for the first stage of water storage of Datengxia Gorge Water Conservancy Project

在线阅读下载全文

作  者:樊现元[1] FAN Xian-yuan(Guangxi Water&Power Design Institute Co.,Ltd.,Nanning 530023,China)

机构地区:[1]广西水利电力勘测设计研究院有限责任公司,南宁530023

出  处:《广西水利水电》2025年第2期111-114,共4页Guangxi Water Resources & Hydropower Engineering

摘  要:大藤峡水利枢纽工程淹没涉及实物总类多、数量大,为确保汛期移民的生命和财产安全,根据相关规范确定度汛标准和度汛范围,并调查统计度汛范围内实物成果,根据淹没影响实物特点和移民安置工作进度拟定移民安置度汛方案,为移民汛期安全度汛奠定坚实基础。The inundation due to Dtengxia Gorge Water Conservancy Project involves many types and a large number of physical objects.In order to ensure the life and property safety of migrants during flood period,the flood control standard and scope were determined in accordance with relevant specifications;investigation and statistics of physi-cal objects within the flood control area were conducted;the flood period plan of resettlement was drawn up accord-ing to the characteristics of the physical objects influenced by inundation and the progress of the resettlement work,so as to laid a solid foundation for the safety during flood period.

关 键 词:水利工程 淹没区 度汛方案 大藤峡水利枢纽 

分 类 号:TV877[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象