检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:林航 Lin Hang(Shanghai Nuclear Engineering Research&Design Institute Co.,Ltd.Shanghai 200233)
机构地区:[1]上海核工程研究设计院股份有限公司,上海200233
出 处:《设备监理》2025年第2期1-4,共4页Plant Engineering Consultants
摘 要:开展核电设备供应商质量保证监查对于核电厂质量保证体系的有效运行发挥着重要作用。本文分析了当前核电多项目并行建设背景下核电设备供应商质量保证监查活动存在的人力资源、监查频次、监查深度和监查结果统计分析方面的不足和挑战,并介绍了多项目集约化管理下总承包方的应对措施和管理实践经验,为后续核电设备供应商质量保证监查工作提供借鉴和参考。Performing quality assurance audit for nuclear power equipment suppliers plays a crucial role in the effective operation of the quality assurance system for nuclear power plants.This article analyzes the shortcomings and challenges of quality assurance audit for nuclear power equipment suppliers including human resource,frequency,depth and statistical analysis in the context of concurrent multi-project construction.It also introduces the countermeasures and management practices of the general contractor,providing references and insights for the following quality assurance audits of nuclear power equipment suppliers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49