检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中铁工程装备集团隧道设备制造有限公司,河南省郑州市450000
出 处:《工程机械》2025年第5期122-126,I0007,共6页Construction Machinery and Equipment
摘 要:抽水蓄能电站提供清洁能源,具有调峰储能、稳定电网的功能。抽水蓄能地下厂房支护作业,仍处于人工、半机械化施工阶段。为了提高施工效率,降低施工风险,提出一种抽水蓄能锚杆台车。该锚杆台车主要由底盘系统、钻臂、大长度双推进梁锚杆机头、可升降驾驶室、注浆系统、遥控系统等组成,通过大长度锚杆机头与注浆系统的协同作业,进行6m、9m锚杆的“钻、注、锚”机械一体化施工。Pumped storage power plant is an emerging clean energy,with the functions of peak energy storage and grid stabilization.The support operation of underground pumped storage plant is still in the stage of manual and semi-mechanized construction.To improve the construction efficiency and reduce the construction risks,a rock bolting rig for pumped storage is proposed.The rock bolting rig mainly consists of a chassis system,a drill boom,a long-length double-beam bolting head,a liftable cab,an injection system and a remote control system,which,through the collaborative operation of the long-length bolting head and the injection system,performs mechanically integrated construction of“drilling,injection and bolting”of bolts of 6 m and 9 m.
关 键 词:抽水蓄能 锚杆台车 地下厂房 大长度锚杆 锚杆施工
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7