牛山污水处理厂二期工程设计和运行  

Design and Operation of Niushan Wastewater Plant Phase II Engineer

在线阅读下载全文

作  者:邓斯琴 刘惠成 DENG Siqin;LIU Huicheng(Xudong Environmental Protection Technology Co.,Ltd.,Foshan 528300,China;East City Niushan Wastewater Treated Service Co.,Ltd.,Dongguan 523128,China)

机构地区:[1]佛山市旭东环保科技有限公司,广东佛山528300 [2]东莞市东城牛山污水处理服务有限公司,广东东莞523128

出  处:《山东化工》2025年第7期260-261,265,共3页Shandong Chemical Industry

摘  要:牛山污水处理厂二期工程,采用CASS+智能反硝化池工艺,出水达到国家《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准和广东省《水污染物排放限值》(DB 44/26—2001)一级标准两者的较严值。本文讲述该厂的工艺设计、设备参数和运行存在的问题及建议。Niushan wastewater plant phase II engineer is that the inverted CASS+intelligent denitrification pool process is used.The effluent from new process can meet both the national"urban sewage treatment plant pollutant discharge standard"(GB 18918—2002)standard of level 1 A and the first level standard of Guangdong Province's"emission limits for water pollutants"(DB 44/26—2001).This article discusses the process design,equipment parameters,and operational issues and suggestions of the factory.

关 键 词:CASS 智能反硝化滤池 城市污水 

分 类 号:X799.3[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象