城市装配式双层盾构隧道与现浇形式经济效益对比分析  

Comparative Analysis of Economic Benefits between Urban Prefabricated Double-layer Shield Tunnels and Cast-in-Place Forms

在线阅读下载全文

作  者:姜海西 JIANG Hai-xi(Shanghai Chengtou Highway InvestmentCo.,Ltd.,Shanghai 200335,China)

机构地区:[1]上海城投公路投资(集团)有限公司,上海200335

出  处:《中国市政工程》2025年第2期44-47,143,144,共6页China Municipal Engineering

摘  要:文章以上海市周家嘴路隧道工程为工程实例,详述了城市装配式双层盾构隧道与现浇形式的施工工艺的区别,在此基础上进行了经济效益对比分析。单纯从工程预算角度看,预制装配式费用高于现浇,但是从工程实践效果来看,预制拼装技术确保了安全质量,大幅缩短了结构施工周期(缩短80%以上),大幅提升了工效(提高70%以上),大幅减少了现场作业人员(减少80%以上),大幅提高了预制化率(到达90%以上)。同时,该技术实现了专业化现代化工厂建造有利于高素质产业工人的培育,有利于企业及产业的长远发展。Taking the Zhoujiazui Road Tunnel project in Shanghai as an engineering example,this paper details the differences in construction techniques between prefabricated double-deck shield tunneling and cast-in-place methods.Based on this,an economic benefit comparison analysis is conducted.From the perspective of engineering budget alone,the cost of prefabricated assembly is higher than that of cast-in-place construction.However,in terms of practical engineering outcomes,prefabricated assembly technology ensures safety and quality,significantly shortens the structural construction period(by over 80%),greatly improves work efficiency(by over 70%),substantially reduces the number of on-site workers(by over 80%),and significantly increases the prefabrication rate(to over 90%).Additionally,this technology enables professional modern factory construction,which is conducive to the cultivation of high-quality industrial workers and the long-term development of enterprises and industries.

关 键 词:城市隧道 装配式 现浇结构 经济效益对比 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象