检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马鑫 薛飞 顾文波 李宏强 吕思卓 MA Xin;XUE Fei;GU Wenbo;LI Hongqiang;LÜSizhuo(Electric Power Research Institute of State Grid Ningxia Electric Power Co.,Ltd.,Yinchuan 750002,China;China Electric Power Research Institute,Beijing 100192,China)
机构地区:[1]国网宁夏电力有限公司电力科学研究院,宁夏银川750002 [2]中国电力科学研究院有限公司,北京100192
出 处:《电力自动化设备》2025年第5期40-46,64,共8页Electric Power Automation Equipment
基 金:国网宁夏电力有限公司科技项目(5229DK230002)。
摘 要:大规模配置分布式调相机以保证新能源多场站的短路比满足要求,存在成本难以承受的实际困难,亟需实现构网型储能与分布式调相机的最优化配置。提出考虑新能源多场站短路比约束的最小短路容量建模方法以及配置分布式调相机及构网型储能后并网点短路容量的计算方法,实现多场站短路比约束的线性化表达;构建考虑新能源多场站短路比约束的分布式调相机及构网型储能优化配置模型;以实际光伏基地为算例,分析构网型储能的短时过流能力对多场站短路比及短路容量的影响,给出构网型储能及分布式调相机的优化配置方案,并分析同一配置方案下采用不同计算方法的多场站短路比与短路容量结果的误差。结果表明所提方法的保守度满足工程应用需要,验证了所提方法的有效性和实用性。The large-scale configuration of distributed synchronous condensers to ensure that the multiple renewable energy stations’short circuit ratio(MRSCR)meet the requirements,has practical difficulties with unbearable cost.It is urgent to realize the optimal configuration of grid-forming energy storage and distributed synchronous condenser.A modeling method of minimum short circuit capacity considering the MRSCR constraint and a calculation method of short circuit capacity of the point of common coupling after the configuration of distributed synchronous condenser and grid-forming energy storage are proposed to realize the linearization of MRSCR constraint.The optimal configuration model of distributed synchronous condenser and grid-forming energy storage considering the MRSCR constraint is established.Taking an actual photovoltaic base as the example,the influence of short-time overcurrent capacity of grid-forming energy storage on short circuit ratio and short circuit capacity of multiple stations is analyzed,the optimal configuration scheme of grid-forming energy storage and distributed synchronous condenser is given,and the error of short circuit ratio and short circuit capacity of multiple stations obtained by different calculation methods under the same configuration scheme is analyzed.The results show that the conservative degree of the proposed method meets the requirements of engineering application,and the effectiveness and practicability of the proposed method are verified.
关 键 词:新能源多场站短路比 线性化 构网型储能 分布式调相机 优化配置
分 类 号:TM713[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.170