检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王明深 袁晓冬 曾飞 吕舒康 韩华春 缪惠宇 潘益 WANG Mingshen;YUAN Xiaodong;ZENG Fei;LÜ Shukang;HAN Huachun;MIAO Huiyu;PAN Yi(Electric Power Research Institute of State Grid Jiangsu Electric Power Co.,Ltd.,Nanjing 211103,China)
机构地区:[1]国网江苏省电力有限公司电力科学研究院,江苏南京211103
出 处:《电力自动化设备》2025年第5期65-76,共12页Electric Power Automation Equipment
基 金:国家重点研发计划项目(2021YFB2501600);国家自然科学基金资助项目(52107099)。
摘 要:充电基础设施的建设规划和调度运行是满足电动汽车充电需求的关键因素,而规划和运行以电动汽车充电需求预测为决策依据。基于此,介绍了充电需求的时间分布和空间分布预测方法,阐述各类方法的优缺点及使用场景;总结了影响充电设施规划的因素,分别阐述充电设施选址和容量规划方法;分析了充电调度策略对电网、充电设施运营商、用户的影响,按照优化目标介绍调度运行的不同策略;结合国内外相关电动汽车充电示范应用,说明了调度策略的实际运行效果;围绕现有电动汽车充电问题中存在的不足,展望了电动汽车充电问题的未来发展方向。The planning and scheduling of charging infrastructure are the key factors to meet the charging demand of electric vehicles.The planning and scheduling of charging facilities are based on charging demand prediction.Based on this,the time distribution and spatial distribution prediction methods of charging demand are introduced,and the advantages and disadvantages of various methods and their application scenarios are expounded.The factors that affect the planning of charging facilities are summarized,and the methods of site selection and capacity planning of charging facilities are expounded respectively.The influence of charging scheduling strategy on power grid,charging facility operators and users is analyzed,and different scheduling strategies are presented according to optimization targets.Combined with electric vehicle charging demonstration applications at home and abroad,the actual operation effect of scheduling strategy is explained.Based on the existing shortcomings of electric vehicle charging problems,the future development direction of electric vehicle charging problems is prospected.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7