关于城市轨道交通系统联调前置条件检查若干问题的浅析  

Brief Analysis of Several Problems on the Precondition Check of Joint Commissioning of Urban Rail Transit System

在线阅读下载全文

作  者:李贝 周海龙 LI Bei;ZHOU Hailong(Operating Branch,Zhengzhou Metro Group Co.,Ltd.,Zhengzhou 450003,China)

机构地区:[1]郑州轨道交通运营有限公司,河南郑州450003

出  处:《科技创新与生产力》2025年第4期125-129,共5页Sci-tech Innovation and Productivity

摘  要:文章阐述了在城市轨道交通建设中系统联调的重要性及目的,从城市轨道交通系统联调整体调试全过程出发,以郑州市轨道交通5号线自主联调调试过程中出现的问题为例进行系统分析,提出整改方案,并根据一定的模型参数设定,得出系统联调整体调试的前置条件的重要性,为后续线路提供模板及参考经验。This paper explains the importance and purpose of system joint commissioning in the construction of urban rail transit,starting from the entire process of urban rail transit system joint commissioning and overall adjustment,taking the problems arising from the process of autonomous joint commissioning and adjustment of Zhengzhou Rail Transit Line 5 as an example to make system analysis,puts forward rectification plans,and according to certain model parameter settings,draws the importance of the preconditions of the system joint commissioning and overall adjustment,and provide templates and reference experience for subsequent lines.

关 键 词:城市轨道交通 自主联调 前置条件检查 

分 类 号:U239.5[交通运输工程—道路与铁道工程]

 