检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭一师 Peng Yishi(Shanghai Zhenhua Heavy Industry(Group)Co.,Ltd.,Shanghai 200125,CHN)
机构地区:[1]上海振华重工(集团)股份有限公司,上海200125
出 处:《模具制造》2025年第5期246-248,共3页Die & Mould Manufacture
摘 要:围绕安庆港中心港区皖河新港一期岸边集装箱装卸桥安装项目展开。该项目施工环境复杂,安全风险大。目前其安全管理存在组织结构不完善、技术措施执行不力、安全教育培训不足、应急响应机制不健全等问题。运用PDCA方法,从计划、执行、检查、行动4个阶段制订并实施安全管理策略,提升项目安全管理水平,保障施工安全。It focuses on the installation project of the container loading and unloading bridge on the first phase of the Wanhe New Port in the central port area of Anqing Port.The construction environment of this project is complex and poses significant safety risks.At present,there are problems with its security management,such as incomplete organizational structure,ineffective implementation of technical measures,insufficient safety education and training,and inadequate emergency response mechanisms.To this end,the PDCA method is used to develop and implement safety management strategies from the four stages of planning,execution,inspection,and action,aiming to improve the level of project safety management and ensure construction safety.
关 键 词:岸边集装箱装卸桥安装 PDCA方法 应急响应 技术保障
分 类 号:X947[环境科学与工程—安全科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49