检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:慈鸿亮 Ci Hongliang(China Communications Construction Corporation Rail Transit Branch,Beijing 102200,China)
出 处:《工程造价管理》2025年第2期48-54,共7页Engineering Cost Management
摘 要:城市轨道交通施工合同存在条款不够细致等粗放式管理问题,而精细化管理是解决这些问题的可行模式。文章以成都轨道交通30号线为例,分析施工合同的背景,构建合同精细化管理体系,建立合同精细化管理框架,系统梳理主要内容。实践结果表明:合同精细化管理在分包结算等方面取得一定成效,对推动城市轨道交通施工合同管理改革将产生积极作用。There are some extensive management problems in urban railway construction contract such as the terms are not detailed enough,and fine management is a feasible model to solve the problems.This paper takes Chengdu Rail Transit Line30 as an example,the background of the construction contract is firstly analyzed.Secondly,the contract fine management system is built and the contract fine management framework is established.Thirdly,the main contents are systematically reviewed.The results of the case study show that the fine management of the contract has achieved some results in the settlement of subcontracts.The study plays a positive role in promoting the reform of urban railway construction contract management.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7