检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Minjie Hu
机构地区:[1]China Resources Urban Development Consulting Co.,Ltd.,Guangzhou 510000,Guangdong,China
出 处:《Journal of World Architecture》2025年第2期22-28,共7页世界建筑(百图)
摘 要:Against the backdrop of the increasingly complex construction market environment,the whole-process cost management of agency-built projects faces issues such as cost overruns and insufficient management efficiency due to the numerous stages and high technical requirements involved.This paper focuses on the key stages of whole-process cost management in agency-built projects,including project initiation,design,construction,and completion.It proposes strategies to optimize the cost management process and enhance management efficiency,providing theoretical support and practical guidance for the whole-process cost management under the agency-built model.
关 键 词:Agency-built projects Whole-process cost management Cost control Dynamic management Completion settlement
分 类 号:TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49