多沙河流水库清淤规模及运行方式研究--以延安市王瑶水库为例  

Dredging Scheme and Operational Mode for Reservoir in Heavily Sediment-laden Rivers--A Case Study on Wangyao Reservior

在线阅读下载全文

作  者:燕荔 王新宏[2] 杨砾 董志涛 YAN Li;WANG Xinhong;YANG Li;DONG Zhitao(Shaanxi Province Institute of Water Resource and Electric Power Investigation and Design(Group)Co.,Ltd.,Xi′an,Shaanxi 710001,China;State Key Laboratory of Ecological Water Resources in Northwest Arid Region,Xi′an University of Technology,Xi′an,Shaanxi 710048,China)

机构地区:[1]陕西省水利水电勘察设计研究院(集团)有限公司,陕西西安710001 [2]西安理工大学省部共建西北旱区生态水利国家重点实验室,陕西西安710048

出  处:《水利与建筑工程学报》2025年第2期197-204,226,共9页Journal of Water Resources and Architectural Engineering

基  金:国家自然科学基金项目(52279075);陕西省水利科技项目(2018slkj-3);陕西省国资委科技创新专项资金计划项目(ZXZJ-2024-049)。

摘  要:针对多沙河流水库淤积过快问题,采用人工清淤方式恢复水库有效和防洪库容。以延安市王瑶水库为例,采用一维恒定不平衡输沙数学模型,经过多个方案的优化与比较,确定王瑶水库运行方式为:在汛期7月1日至8月14日期间敞泄排沙,其余时段蓄水运行;基于水库终极库容的理论,建立适用于王瑶水库多目标要求的清淤模型,并通过调整参数,拟定了3种不同的清淤规模,清淤量分别为1229万m^(3)、1650万m^(3)、2032万m^(3),经技术经济综合比选后,推荐王瑶水库清淤规模为1650万m^(3)。其方法和理论可为多沙河流水库确定合理清淤规模和清淤体几何形态提供参考。Reservoir siltation affects the benefits of flood control,water supply,irrigation,and many other aspects of reservoirs,especially for reservoirs in sandy river basins where the siltation rate is even faster.To address the issue of rapid reservoir siltation,manual dredging is adopted to restore the effective storage capacity and flood control capacity of the reservoir.Yan'an City in Shaanxi province faces a shortage of water resources,and the Wangyao Reservoir serves as a large reservoir for flood control and water supply in the city.Currently,the reservoir is severely silted up and urgently needs desilting and capacity expansion.Using a one-dimensional steady-state unbalanced sediment transport mathematical model,after optimizing and comparing multiple scenarios,the operation mode for Wangyao Reservoir was determined as follows:during the flood season from July 1st to August 14th,the reservoir will be open for discharging sediment,and for the rest of the time,it will be used for water storage.Based on the theory of the ultimate storage capacity of the reservoir.a multi-objective desilting model tailored for the Wangyao Reservoir was established.Three different scales of dredging with volumes of 12.29 million m^(3),16.50 million m^(3),and 20.32 million m^(3) were proposed.After comprehensive technical and economic comparisons,a desilting scale of 16.5 million cubic meters was recommended for the Wangyao reservoir.The method and theory can serve as a reference for determining the reasonable dredging scale and the geometric configuration of the dredged material for reservoirs in sandy river basins.

关 键 词:运行方式 终极库容 清淤规模 

分 类 号:TV697.31[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象