检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水利水电工程学院,江苏南京210098
出 处:《水力发电》2002年第12期51-54,共4页Water Power
基 金:国家自然科学基金资助项目(50139030)
摘 要:针对佛子岭连拱坝垂线改造前后坝顶水平位移实测资料进行分析,分别对新、旧两套垂线系统所测水平位移建立各自的回归模型。深入分析了佛子岭连拱坝的变形性态及变形规律,结果表明:坝体变形主要受温度的影响,水压和时效的影响较小;高水位、低气温、高水温是连拱坝变形最不利的荷载工况。In this paper, according to the observation data of horizontal displacement in the period of the rebuilding of plumb, the deformation law of Fuziling Multi arch Dam is analyzed. The regression models are given respectively based on the system of the new plumb and the old one. The deformation behavior and law of Fuziling Multi arch Dam is deeply researched. The research results showed that the deformation of the dam is effected more by temperature than by hydraulic pressure and time. The most disadvantageous loading condition of the deformation of multi arch dam is of high water level, low air temperature and high water temperature.
分 类 号:TV642.4[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.12