碾压混凝土坝防渗结构型式的工程实践  被引量:11

Practice in seepage prevention structures of roller-compacted concrete dams

在线阅读下载全文

作  者:朱岳明[1] 储小钊[2] 

机构地区:[1]河海大学水利水电工程学院,江苏南京210098 [2]国家电力公司北京勘测设计研究院,北京100024

出  处:《河海大学学报(自然科学版)》2003年第1期16-20,共5页Journal of Hohai University(Natural Sciences)

基  金:教育部博士点基金资助项目(97029406);水利部水利技术开发基金资助项目(SL9705)

摘  要:针对碾压混凝土坝的渗流特性及其渗控设计的复杂性,在多年理论研究工作的基础上对国内外多座已建大坝工程所用的防渗结构型式和运行情况进行介绍,并对不同典型防渗结构型式的主要优缺点作了分析,推荐了既有较好防渗功能又能充分发挥碾压混凝土施工优点的优选防渗结构型式.In consideration of the seepage properties of rollercompacted concrete dams (RCCDs) and the complicacy of seepagecontrol design, an introduction is given to the practice in seepage prevention structures and their performances in projects of some existing dams at home and abroad. The main advantages and disadvantages of some typical seepage prevention structures are analyzed through comparison. Finally, an optimum seepage prevention structure for RCCDs is recommended, which can bring the main advantages of rollercompacted concrete construction into full play.

关 键 词:碾压混凝土坝 防渗结构型式 二级配碾压混凝土 渗透 

分 类 号:TV642.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象