出 处:《计算机应用与软件》2003年第2期30-32,共3页Computer Applications and Software
摘 要:网络计划的过程中经常会出现资源费用需求超标的情况,资源和工期相冲突的问题如果得以解决,将对整个项目工程的完工具有重大意义。本文分析了资源平衡的几种类型,并在讨论若干基本平衡技术的基础上提出了一个逆向平衡的算法,最后用一个示例以说明本算法的可行性和有效性。It is often found that the resources and the expenditures are being insufficient for the requirements of a project in progress if a method of project management, called network planning, is adopted. Obviously, how to resolve the contradiction between resources and time limit is significant to the completion of the project. Some patterns regarding the resources equalization are analyzed and several types of measures that can be used in all patterns are discussed in thie paper. An algorithm based on reverse equalization is put forward, and a simple example is advanced to explain the feasibility and availability of the algorithm.
关 键 词:网络计划 资源平衡 工程项目管理 计划管理 运筹学
分 类 号:TU71[建筑科学—建筑技术科学] F284[经济管理—国民经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222