检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨岐[1]
出 处:《核动力工程》2003年第1期1-3,7,共4页Nuclear Power Engineering
摘 要:秦山核电二期工程与大亚湾核电站相比,反应堆功率下降,冷却剂系统三环路变为两环路。因此,重新设计了有关系统,并进行了相应的试验研究与工程验证。初步运行结果表明,设计是成功的。本文介绍部分系统的设计变化与特点以及相关的试验研究,反映设计与试验研究的成功结合,展现我国自主发展核电、自主设计大中型商用核电站的能力。Compared with that of Daya Bay Nuclear Power Plant, the reactor power of QS-II Nuclear Power Plant is decreased and the primary coolant system is changed from three loops to two loops. Thereby the related systems were re-designed, and corresponding tests and engineering validation were carried out. Results of preliminary operation indicate that it is successful. The paper describes the design modifications, features and corresponding tests of some systems, reflecting the successful incorporation of engineering and testing, and revealing the capability to develop nuclear power and design the large or medium sized commercial NPP on Self-Reliance in China.
分 类 号:TM623[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15