检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《桥梁建设》2003年第1期9-11,共3页Bridge Construction
摘 要:崖门大桥主桥为(50+115+338+115+50)m双塔单索面预应力混凝土斜拉桥,采用墩、塔、梁固结的结构体系,主跨338m,设计新颖,在施工中大量使用了新工艺、新技术。介绍其基础施工、上部结构施工方案、施工步骤以及主要施工技术特点和技术难点。The main spans of Yamen Bridge are designed as a prestressed concrete cablestayed bridge of twin pylons and single cable plane with the spans arranged as (50+115+338+115+50) m and with their piers, pylons and girder rigidly connected. The bridge is unique in design and is notable for quite a few new workmanship and new techniques used in the construction. In this paper, the foundation construction, superstructure construction schemes and procedures and the principal construction technique features and difficulties of the bridge are expounded.
关 键 词:崖门大桥 主桥 斜拉桥 桥梁架设 施工方法 施工技术
分 类 号:U448.27[建筑科学—桥梁与隧道工程] U445.466[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15