崖门大桥主梁牵索挂篮施工模拟计算  被引量:14

Simulation Calculation for Construction with Guyed Traveler for Main Girder of Yamen Bridge

在线阅读下载全文

作  者:苏成[1] 陈太聪[1] 韩大建[1] 邓江[2] 

机构地区:[1]华南理工大学土木工程系,广东广州510640 [2]广东冠粤路桥有限公司,广东广州510600

出  处:《桥梁建设》2003年第1期12-15,共4页Bridge Construction

摘  要:准确细致的施工过程仿真计算是大跨度混凝土斜拉桥施工监控的关键问题之一,它可以为大桥各阶段的施工监控提供理论依据。根据崖门大桥主梁施工工艺的特点,建立了牵索挂篮施工模拟计算的流程,并对牵索方案的选择以及主梁立模标高的确定等问题进行了探讨。在此基础上,给出了崖门大桥主梁的施工流程及其计算结果。The correct and careful simulation calculation for construction process is one of the important concerns for construction control of longspan concrete cablestayed bridges and can provide theoretic bases for the construction control at various stages of the bridges. In this paper, according to the construction technique features of the main girder of Yamen Bridge, the process of construction with the guyed traveler is established and the issues regarding the selection of the guy construction schemes and determination of the elevation of the girder formwork are discussed, and the construction process and calculation results of Yamen Bridge are presented as well.

关 键 词:崖门大桥 主梁 模拟计算 斜拉桥 预应力混凝土结构 挂篮 桥梁架设 结构分析 桥梁施工 

分 类 号:U448.27[建筑科学—桥梁与隧道工程] U445.466[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象