检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华南理工大学建筑学院土木工程系,广东广州510640 [2]广东冠粤路桥有限公司,广东广州510600
出 处:《桥梁建设》2003年第1期19-22,34,共5页Bridge Construction
摘 要:通过对崖门大桥施工过程温度效应的理论分析与现场实测,揭示了大桥在不同施工阶段下的温度影响规律,从而为补偿温度效应、准确给定立模标高以及寻找合理的标高、索力测量时间提供了科学的依据。有关成果对于在同类型大跨度混凝土斜拉桥施工过程中把握温度影响规律、有效消除温度效应有一定的参考价值。This paper illustrates the temperature effect law at different stages of construction of Yamen Bridge, and provides the scientific bases for temperature effect compensation, correct determination or reasonable selection of formwork elevation, and proper time for cable force measurement in accordance with the theoretical analysis and field measurements of the bridge under construction. The results presented in the paper are of certain reference to the understanding and effective reduction of temperature influences during the construction of longspan concrete cablestayed bridges of similar kind.
关 键 词:崖门大桥 斜拉桥 预应力混凝土结构 结构分析 温度测量 桥梁施工 温度效应
分 类 号:U448.27[建筑科学—桥梁与隧道工程] U446.2[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30