机构地区:[1]重庆交通学院西南水运工程科学研究所,重庆400016
出 处:《重庆交通学院学报》2003年第1期100-104,共5页Journal of Chongqing Jiaotong University
摘 要:根据金沙江溪洛渡水电站重大件设备的运输要求,对水富港重大件专用码头的航道条件、港址选择、装卸工艺、平面布置及水工结构等进行可行性研究.该码头所在岸坡较缓、水位变幅和水边线摆动均较大,采用浮吊装卸工艺和顺岸斜坡码头,解决了重大件运输水陆转运的装卸问题,可作为类似工程的参考.According to the transporting need of the heavy cargo for Xiluodu hydropower station in Jinshajiang River,the following questions on the heavy cargo special wharf in Shuifu port are studied,such as the waterway condition,site selection,load and unload technology,plane layout and hydraulic struture and so on.Because of the gentle bank slope,the larger range of the water level change and water sideline wing at the wharf,the floating crane handling technology and the sloping quay are adopted,the load and unload problem of the water-land transfer of the heavy cargo is solved.It can be refered to the similar wharf project.
关 键 词:重大件码头 装卸工艺 金沙江溪洛渡水电站 航道条件 港址选择 平面布置 水工结构
分 类 号:U656.1[交通运输工程—港口、海岸及近海工程] U651[交通运输工程—船舶与海洋工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90