检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜亚军[1] 陈国先[1] 陈秀明[2] 陈俊华[2] 雷效章[2] 蔡小虎[2] 彭沛好[2]
机构地区:[1]四川工业学院区域社会经济研究所,成都610039 [2]四川省林业科学研究院,成都610081
出 处:《生态学杂志》2003年第1期69-72,共4页Chinese Journal of Ecology
基 金:国家"九五"重点科技 (攻关 )资助项目 (96 0 0 7 0 4)
摘 要:本文利用中国生态林业工程综合评价指标体系对川渝 77县长防林一期工程的效益进行了综合评价。迄今综合效益提高了 6倍 ,到 2 0 10年提高约 9倍。还对川江各支流的林分结构调整与新建长防林提出了建议。Using the comprehensive evaluation indexes system of chinese ecological forest engineering,we evaluated the benefit of 77 countoies' form Yangtze River protection forest engineering (the first period )in Sichuan and Chongqing. The comprehensive benefit is 6 times more so far, and 9 times more by 2010 than 1986 (the starting time).Furthermore, suggestions on forestst and structure adjustment of every branch of Yangtze River and on the new foundation of Yangtze River Shelter Forest in Sichuan and Chongqing were put forward.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145