检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]太原科技大学交通与物流学院,山西太原030024
出 处:《建筑经济》2015年第3期112-115,共4页Construction Economy
基 金:太原科技大学校博士科研启动项目(20122031)资助
摘 要:大型建设项目分部分项工程较多,涉及不同的参建单位,项目管理部门很难全面掌握项目实施过程中相关费用的执行和变更情况。为此,本文将费用管理系统分成概预算管理、工程量清单管理和决算管理三大模块,然后采用oracle数据库对系统数据进行设计,给出了数据表之间的关系和基本表。最后,基于.Net平台开发费用管理信息系统。The large construction project contains many sub projects,involving different design units and construction units,it is very difficult to fully grasp the performing and changing of the costs for the project management department. Therefore,divides the cost management system into the budget management,the engineering quantity list management and the final accounts management three parts. Then,designs the system data based on the oracle data,and give the relationships between the data tables and the basic tables. Finally,develops the cost management system based on the.Net platform.
分 类 号:TP311.52[自动化与计算机技术—计算机软件与理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249