检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高超[1] 王建波[1] 彭林[1] 潘志行[1] 孙先迅
出 处:《建筑技术开发》2017年第4X期40-42,共3页Building Technology Development
摘 要:建设银行二期项目数控机房等5项工程位于北京市海淀区中关村创新园,设计施工专业众多,技术要求高,对施工管理要求高。在工程实施之前,项目部以计划管理为核心,将施工进度、商务进度、技术进度均纳入计划管理,以达到从安全、质量、进度、造价等综合方面达到完美履约的目标。China Construction Bank Phase Ⅱ numerical control machine room and other four projects were located in Zhongguancun Innovation Park of Haidian district.It involved multiple construction disciplines,high technical specifications and strict requirements for construction management.Before engineering construction,the project department focused on plan management to cover construction schedule,commercial schedule and technical schedule into plan management,with the purpose to effectively execute contract on overall aspects,such as safely,quality,schedule and cost,etc.
分 类 号:TU722[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117