检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王金文[1] 魏守平[1] 张初旺[2] 周瑛[2] 杨巧艺[2]
机构地区:[1]华中科技大学水电与数字化工程学院,湖北武汉430074 [2]福建电力调度通信中心,福建福州350003
出 处:《水电能源科学》2003年第1期42-45,共4页Water Resources and Power
摘 要:针对水电系统长期耗能最小问题设计了求解方法:首先定义一个搜索方向集,然后按等微增率原理,依次按对目标有利程度的大小顺序选择搜索方向逐时段进行系统负荷平衡。通过对福建水电站系统的应用,证明长期耗能最小发电调度模型及其求解方法具有耗时较少、能有效减少弃水等优点。In the hydropower systems the problem of energy consumption minimization can be simply expressed as follows: given a load demand process, schedule the generation of hydroplants such that the potential energy at the endofstudy is maximal. To solve this problem, this paper designs a procedure, in which a set of search directions is firstly defined, and then based on the principle of reaching equal incremental, one of the defined directions is selected at a time, in order to improve the objective, under condition to meet the power demand stage by stage. With application to Fujian hydroplant systems, the model of energy consumption minimization and its solving method are practically tested efficiently.
关 键 词:大规模水电系统 长期优化调度 耗能最小 等微增率 子模型重构
分 类 号:TV697.12[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15