李家沙水道切嘴工程对其分流比的影响  被引量:2

Effect of mouth-cutting project at Lijiasha on diversion ratio

在线阅读下载全文

作  者:唐洪武[1] 肖洋[1] 李福田[1] 王志良[1] 徐夕荣[1] 

机构地区:[1]河海大学水利水电工程学院,江苏南京210098

出  处:《河海大学学报(自然科学版)》2003年第2期128-131,共4页Journal of Hohai University(Natural Sciences)

摘  要:分析了李家沙水道工程前大水高潮期间分流比和有关水力参数实测资料以及工程后的试验数据,在此基础上,建立了工程前后分流比与动量因子间的函数关系,给出了相应的经验公式.研究表明,切嘴工程后分流比变化除受沙湾水道弯道水流影响外,还与下游磨碟头断面卡水作用有关.Based on a comparison of the diversion ratio at Lijiasha during the hightide period and some related hydraulic parameters measured before the start of the mouthcutting project with the experimental data after the completion of the project, the functional relations between the diversion ratio and momentum factor before and after the project were established, and some empirical formulas were derived. The research shows that the diversion ratio at Lijiasha after the completion of the project is not only affected by the flow from the bending Shawan waterway, but also related to the water retaining of the lower Modietou section.

关 键 词:李家沙水道 切嘴工程 分流比 影响 河道整治 

分 类 号:U617.2[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象