检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学土木水利学院,湖北宜昌443002 [2]大连理工大学,辽宁大连116023
出 处:《水电站设计》2003年第1期6-8,19,共4页Design of Hydroelectric Power Station
摘 要:以混凝土拱坝的一个坝段为例,通过仿真分析方法,在同等条件下计算了不同浇筑块长度的温度过程与应力发展过程。从各块体中部最高温度、最大水平约束应力、断面平均水平约束应力、典型点应力发展过程、正反向应力变幅5个方面,比较系统地阐述了大体积混凝土通仓浇筑问题。分析结果在一定程度上支持了混凝土超长浇筑块施工。In this paper a concrete column block is used as a sample to study temperature and stress developing process when the block length varies from 20m,40m,60m,80m upto 120m by method of simulation analysis.Full length placement of large concrete block is systematically expounded from the max temperature,max horizontal stress,average section stress,stress development process of typical points and maxium variation range of horizontal stress in the middle section of each block.The analysis results support full length placement of extra long concrete blocks.
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90