检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部黄河水利委员会勘测规划设计研究院,郑州450003
出 处:《水力发电学报》2003年第1期1-8,共8页Journal of Hydroelectric Engineering
摘 要:为了消除水电站调峰对下游河道供水、灌溉、生态环境、航运等方面的不利影响 ,充分发挥河流梯级开发的综合利用效益 ,需要在调峰水电站的下游布置反调节工程。本文针对反调节工程的特点和作用 ,根据边际分析理论 ,提出了在不同情况下反调节工程的国民经济评价和财务评价方法 ,并给出实际算例。A reregulating reservoir is need to be built downstream by peak modulation power station in order to eliminate the disadvantages caused by peak modulation on water supply, irrigation, entironment and sail of the lower reach, further more make better use of cascade power stations. According to its characteristics and functions, an economic evaluation and financial analysis method of reregulating reservoir in different cases was put forward in this paper based on marginal analysis theory. An example is also given in the paper.
关 键 词:水利经济学 经济评价 增量分析 反调节工程 水电站 生态环境
分 类 号:TV212[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222