检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张开智[1] 蒋金泉[1] 李大伟[2] 陈国胜[2] 王春增[2]
机构地区:[1]山东科技大学 [2]平煤集团技术中心,河南平顶山467000
出 处:《矿山压力与顶板管理》2002年第3期3-5,共3页Ground Pressure and Strata Control
基 金:山东省自然科学基金项目资助 (Q99F0 7)
摘 要:平煤集团十三矿为新建矿井 ,1 2 0 1 0为二采区首采工作面 ,最大倾角 3 2°,大倾角条件下合理煤柱留设尺寸是该矿采掘设计必须解决的首要问题。通过对不同煤柱宽度时的煤柱破坏发育规律、上下巷位移与变形、煤柱上方支承压力的数值计算分析认为 ,合理煤柱宽度为 8m,比原设计值节省近一半。No.12010 coalface is the first one in No.2 mining area of No.13 coalmine, which is a new, Pingtingshan mining group corporation, the maximum dip angle of coal seam is 32 degree. It is of first important problem that reasonable width of coal pills should be determined to the arrangement of coal mining and tunneling with steep gradient. By numerical calculation of breaking zone, displacement and deformation of both side roadways, abutment pressure of coal pillars are obtained. The results indicate that reasonable width of coal pillars is 8m, which is only half of the design value.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.51