机构地区:[1]大港油田集团公司钻井工程公司,天津大港300280
出 处:《石油钻采工艺》2003年第1期25-28,共4页Oil Drilling & Production Technology
摘 要:大井眼长封固段复杂条件下的固井存在气体易窜、因漏引喷、水泥浆返到设计位置难、不易实施有效的紊流顶替等难题。介绍了青海油田开特米里克构造开 2井高压盐水层、高低压共存的复杂条件下高密度水泥浆性能的室内试验情况 ,通过现场固井施工及相关配套技术的应用 ,取得了大井眼。Cementing in the long isolation section of large borehole in complex conditions can cause many problems, e.g., gas channelling, lost circulation and blowout, difficulty of cement slurry returning to the designed depth and ineffective turbulent displacement, etc. A laboratory test on the performances of high density cement slurry was conducted, and this test was used to simulate the complex conditions of high pressured salt bed and the coexistence of high pressured and low pressured formations in Well Kai 2 in Katemeric Structure of Qinghai Oilfield. The high density cement was used for cementing this well, and some associate technologies were also applied. The results were satisfactory, and some successful practices on cementing the long isolation section of large borehole in complex conditions, and gas channelling remedy work around the annular were applied.
关 键 词:青海油田 水泥浆 固井技术 性能 开特米里克 构造 柴达木盆地
分 类 号:TE256[石油与天然气工程—油气井工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3