石泉扩机工程发电厂房上部结构强度分析与配筋计算  

Strength analysis and reinforcement calculation for powerhouse superstructure of Shiquan expansion project

在线阅读下载全文

作  者:石广斌[1] 杨经会[1] 

机构地区:[1]西北勘测设计研究院,西安710065

出  处:《西北水电》2003年第1期28-31,共4页Northwest Hydropower

摘  要:石泉扩机工程电站厂房上部是箱形钢筋混凝土结构,上下游混凝土墙厚为1.45~2.8 m。在设计过程中,借 助大型有限元软件ANSYS对厂房上部结构进行三维应力和位移分析,并按主拉应力对厂房上部结构进行了配筋 计算,降低了工程量。实践证明:这种分析方法是合理的,计算结果也是可靠的。The upper powerhouse for the Shiquan expansion project is of a reinforcement box construction with upstream and downstream walls 1. 45-2. 8 m in thickness. During design, 3D stress and deformation analysis is carried out on the powerhouse superstructure with the aid of finite element software ANSYS, and reinforcement calculation is conducted in terms of the principal tensile stress, resulting in reduced construction quantity. The practice indicates that this analysis method is rational and the calculation results are reliable.

关 键 词:水电站厂房 箱形结构 三维有限元 强度 应力配筋 位移 

分 类 号:TV731[水利工程—水利水电工程] TU271.1[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象